The Veslefrikk field was developed with a jacket platform, Veslefrikk A (VFA) and a floating production unit, Veslefrikk B (VFB). Production stopped and decommissioning of the field started. Semar contributed to the removal of VFB along with DOF Subsea performing the following four campaigns.
- Removal of flexible hoses and cables between VFA and VFB and transport to shore
- Disconnection of VFB at offshore site and tow to thruster removal site
- Retrieval of mooring lines
- Tow to disposal site